Flooding on the track -video

The stream has become swollen with melt water and days of heavy rain. The new track is being eroded stone by stone. Rifts form in the track side threatening the track.
Work to do in the summer to make a bigger culvert alongside the blocked pipe to cope with the winter surges.

This entry was posted in January 2013 and tagged , . Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s